EL DORADO EHV - SARPETA 345/115 KV SW STA 345kV (J2923)

EL DORADO EHV - SARPETA 345/115 KV SW STA 345kV is a 240.0 MW solar interconnection project in Columbia, Arkansas with a current status of withdrawn. It is proposed to connect at EL DORADO EHV - SARPETA 345/115 KV SW STA 345kV.

240.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameEL DORADO EHV - SARPETA 345/115 KV SW STA 345kV
Queue IDJ2923
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity240.0 MW
StateArkansas
CountyColumbia
Point of interconnectionEL DORADO EHV - SARPETA 345/115 KV SW STA 345kV
Requested (queue) date2022-09-15
Proposed in-service date2028-05-30
Operational date2028-05-30
Withdrawn date2025-07-31
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata