El Dorado Upland SS 115kV is a 150.0 MW solar interconnection project in Union, Arkansas with a current status of withdrawn. It is proposed to connect at El Dorado Upland SS 115kV.

150.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameEl Dorado Upland SS 115kV
Queue IDJ3038
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity150.0 MW
StateArkansas
CountyUnion
Point of interconnectionEl Dorado Upland SS 115kV
Requested (queue) date2022-09-13
Proposed in-service date2027-08-31
Operational date2027-08-31
Withdrawn date2025-07-30
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.