El Molino Solar SLF (25INR0321)

El Molino Solar SLF is a 201.3 MW solar interconnection project in Webb, Texas with a current status of operational. It is proposed to connect at Tap 138kV 80439 LaQuinta - 8297 Bruni 8297.

201.3 MWCapacity
OperationalStatus
WebbMarket
SolarTechnology

Project facts

Canonical nameEl Molino Solar SLF
Queue ID25INR0321
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketWebb
TechnologySolar
Capacity201.3 MW
StateTexas
CountyWebb
Point of interconnectionTap 138kV 80439 LaQuinta - 8297 Bruni 8297
Requested (queue) date2023-01-17
Proposed in-service date
Operational date2027-09-01
Withdrawn date
DeveloperEl Molino Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata