El Patrimonio Solar (23INR0207)

El Patrimonio Solar is a 152.3 MW solar interconnection project in Bexar, Texas with a current status of operational. It is proposed to connect at tap 138kV 5429 Trumbo - 5260 Leon Creek .

152.3 MWCapacity
OperationalStatus
BexarMarket
SolarTechnology

Project facts

Canonical nameEl Patrimonio Solar
Queue ID23INR0207
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketBexar
TechnologySolar
Capacity152.3 MW
StateTexas
CountyBexar
Point of interconnectiontap 138kV 5429 Trumbo - 5260 Leon Creek
Requested (queue) date2021-03-16
Proposed in-service date
Operational date2027-04-29
Withdrawn date
DeveloperHERITAGE SOLAR INC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata