Elbow Mountain (U2-032)

Elbow Mountain is a 20.0 MW wind interconnection project in Garrett, Maryland with a current status of withdrawn.

20.0 MWCapacity
WithdrawnStatus
—Market
WindTechnology

Project facts

Canonical nameElbow Mountain
Queue IDU2-032
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyWind
Capacity20.0 MW
StateMaryland
CountyGarrett
Point of interconnection—
Requested (queue) date2008-06-09
Proposed in-service date2010-10-01
Operational date—
Withdrawn date2008-12-04
Developer—
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata