Elk - Brewster 161 kV Line Tap (J1086)

Elk - Brewster 161 kV Line Tap is a 120.0 MW solar interconnection project in Nobles County, Minnesota with a current status of withdrawn. It is proposed to connect at Elk - Brewster 161 kV Line Tap.

120.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameElk - Brewster 161 kV Line Tap
Queue IDJ1086
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity120.0 MW
StateMinnesota
CountyNobles County
Point of interconnectionElk - Brewster 161 kV Line Tap
Requested (queue) date2018-03-12
Proposed in-service date2021-01-02
Operational date2021-01-02
Withdrawn date2020-03-25
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata