Elk Garden - Junction 138kV (R22)

Elk Garden - Junction 138kV is a 90.0 MW wind interconnection project in Mineral, West Virginia with a current status of withdrawn.

90.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameElk Garden - Junction 138kV
Queue IDR22
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity90.0 MW
StateWest Virginia
CountyMineral
Point of interconnection
Requested (queue) date2006-10-12
Proposed in-service date2009-11-30
Operational date
Withdrawn date2009-01-09
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata