Elk Mound (PV) (69488_ELKMO)

Elk Mound (PV) is a 2.5 MW solar interconnection project in Chippewa, Wisconsin with a current status of operational.

2.5 MWCapacity
OperationalStatus
MISOMarket
SolarTechnology

Project facts

Canonical nameElk Mound (PV)
Queue ID69488_ELKMO
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologySolar
Capacity2.5 MW
StateWisconsin
CountyChippewa
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2025-09-01
Withdrawn date
Developer
Utility / transmission ownerOneEnergy, Inc.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata