The interXdata warehouse tracks 38 interconnection projects in Chippewa, Wisconsin, representing 745 MW of requested capacity.

38Total projects
1Active
35Operational
2Withdrawn
745 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas8369 MW
Other23210 MW
Solar7166 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Wheaton4014_WHT08Gas249.1 MWoperationalChippewa, Wisconsin
Red Cedar - Wheaton 56 161.0kVJ3912Solar150.0 MWwithdrawnChippewa, Wisconsin
Elk Mound7863_2Gas35.5 MWoperationalChippewa, Wisconsin
Elk Mound7863_1Gas35.5 MWoperationalChippewa, Wisconsin
Jim Falls4008_2Other29.6 MWoperationalChippewa, Wisconsin
Jim Falls4008_1Other29.6 MWoperationalChippewa, Wisconsin
MISO Queue Project G832 — Other in Chippewa, WisconsinG832Other20.0 MWwithdrawnChippewa, Wisconsin
Cornell6086_3Other11.5 MWoperationalChippewa, Wisconsin
Cornell6086_2Other11.5 MWoperationalChippewa, Wisconsin
Cornell6086_1Other11.5 MWoperationalChippewa, Wisconsin
Holcombe4007_1Other11.3 MWoperationalChippewa, Wisconsin
Holcombe4007_3Other11.3 MWoperationalChippewa, Wisconsin
Holcombe4007_2Other11.3 MWoperationalChippewa, Wisconsin
Wheaton4014_WHT10Gas9.8 MWoperationalChippewa, Wisconsin
Wheaton4014_WHT12Gas9.8 MWoperationalChippewa, Wisconsin
Wheaton4014_WHT13Gas9.8 MWoperationalChippewa, Wisconsin
Wheaton4014_WHT09Gas9.8 MWoperationalChippewa, Wisconsin
Wheaton4014_WHT11Gas9.8 MWoperationalChippewa, Wisconsin
Wissota4015_2Other7.7 MWoperationalChippewa, Wisconsin
Wissota4015_4Other7.7 MWoperationalChippewa, Wisconsin
Wissota4015_6Other6.0 MWoperationalChippewa, Wisconsin
Wissota4015_5Other6.0 MWoperationalChippewa, Wisconsin
Wissota4015_1Other6.0 MWoperationalChippewa, Wisconsin
Wissota4015_3Other6.0 MWoperationalChippewa, Wisconsin
Lake Hallie68398_LH001Solar5.0 MWoperationalChippewa, Wisconsin
Gilman69935_GILMNSolar3.8 MWactiveChippewa, Wisconsin
Chippewa Falls4000_3Other3.6 MWoperationalChippewa, Wisconsin
Chippewa Falls4000_5Other3.6 MWoperationalChippewa, Wisconsin
Chippewa Falls4000_6Other3.6 MWoperationalChippewa, Wisconsin
Chippewa Falls4000_1Other3.6 MWoperationalChippewa, Wisconsin
Chippewa Falls4000_2Other3.6 MWoperationalChippewa, Wisconsin
Chippewa Falls4000_4Other3.6 MWoperationalChippewa, Wisconsin
Elk Mound (PV)69488_ELKMOSolar2.5 MWoperationalChippewa, Wisconsin
New Auburn DPC Solar60936_PV1Solar2.5 MWoperationalChippewa, Wisconsin
Wolf River (Chipewa 1)67057_707Solar1.5 MWoperationalChippewa, Wisconsin
Lafayette DPC Solar60888_PV1Solar1.0 MWoperationalChippewa, Wisconsin
Cornell6086_4Other0.8 MWoperationalChippewa, Wisconsin
Jim Falls4008_4Other0.6 MWoperationalChippewa, Wisconsin

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.