Elk Unit 4 (27INR0181)

Elk Unit 4 is a 210.0 MW gas interconnection project in Hale, Texas with a current status of operational. It is proposed to connect at 141607 AEEC_5.

210.0 MWCapacity
OperationalStatus
HaleMarket
GasTechnology

Project facts

Canonical nameElk Unit 4
Queue ID27INR0181
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketHale
TechnologyGas
Capacity210.0 MW
StateTexas
CountyHale
Point of interconnection141607 AEEC_5
Requested (queue) date2024-04-09
Proposed in-service date—
Operational date2027-02-28
Withdrawn date—
DeveloperGolden Spread Electric Cooperative, Inc.
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-09-30
Data last materially changed2026-09-30
Page data generated2026-10-12

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata