Elk Unit 4 (27INR0181)
Elk Unit 4 is a 210.0 MW gas interconnection project in Hale, Texas with a current status of operational. It is proposed to connect at 141607 AEEC_5.
210.0 MWCapacity
OperationalStatus
HaleMarket
GasTechnology
Project facts
| Canonical name | Elk Unit 4 |
|---|---|
| Queue ID | 27INR0181 |
| Status | operational |
| Source status | SS Completed, FIS Completed, IA |
| Market | Hale |
| Technology | Gas |
| Capacity | 210.0 MW |
| State | Texas |
| County | Hale |
| Point of interconnection | 141607 AEEC_5 |
| Requested (queue) date | 2024-04-09 |
| Proposed in-service date | — |
| Operational date | 2027-02-28 |
| Withdrawn date | — |
| Developer | Golden Spread Electric Cooperative, Inc. |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata