Ella Wind 3 (G0365)

Ella Wind 3 is a 300.0 MW wind interconnection project in Morrow, Oregon with a current status of operational. It is proposed to connect at A 230 kV substation on BPA's Transmission system in Gilliam or Morrow Co. Ore. near or west of Boardman.

300.0 MWCapacity
OperationalStatus
ORMarket
WindTechnology

Project facts

Canonical nameElla Wind 3
Queue IDG0365
Statusoperational
Source statusENERGIZED
MarketOR
TechnologyWind
Capacity300.0 MW
StateOregon
CountyMorrow
Point of interconnectionA 230 kV substation on BPA's Transmission system in Gilliam or Morrow Co. Ore. near or west of Boardman
Requested (queue) date2009-05-18
Proposed in-service date
Operational date2013-11-01
Withdrawn date
DeveloperWheatridge Wind Energy, LLC
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata