Ellendale - Twin Brooks 345kV (J2338)

Ellendale - Twin Brooks 345kV is a 200.0 MW wind interconnection project in McPherson, South Dakota with a current status of withdrawn. It is proposed to connect at Ellendale - Twin Brooks 345kV.

200.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameEllendale - Twin Brooks 345kV
Queue IDJ2338
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity200.0 MW
StateSouth Dakota
CountyMcPherson
Point of interconnectionEllendale - Twin Brooks 345kV
Requested (queue) date2022-09-15
Proposed in-service date2027-09-01
Operational date2027-09-01
Withdrawn date2025-10-07
Developer
Utility / transmission ownerOtter Tail Power Company

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.