Elm Creek 345 kV interconnection substation (GEN-2021-011)

Elm Creek 345 kV interconnection substation is a 74.9 MW solar interconnection project in Cloud And Mitchell, Kansas with a current status of withdrawn. It is proposed to connect at Elm Creek 345 kV interconnection substation.

74.9 MWCapacity
WithdrawnStatus
KSMarket
SolarTechnology

Project facts

Canonical nameElm Creek 345 kV interconnection substation
Queue IDGEN-2021-011
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologySolar
Capacity74.9 MW
StateKansas
CountyCloud And Mitchell
Point of interconnectionElm Creek 345 kV interconnection substation
Requested (queue) date2021-04-30
Proposed in-service date2025-12-31
Operational date
Withdrawn date2023-08-10
Developer
Utility / transmission ownerITCGP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata