Elm Creek 345kV substation (GEN-2017-119)

Elm Creek 345kV substation is a 180.0 MW wind interconnection project in Cloud/Mitchell, Kansas with a current status of withdrawn. It is proposed to connect at Elm Creek 345kV substation.

180.0 MWCapacity
WithdrawnStatus
KSMarket
WindTechnology

Project facts

Canonical nameElm Creek 345kV substation
Queue IDGEN-2017-119
Statuswithdrawn
Source statusWITHDRAWN
MarketKS
TechnologyWind
Capacity180.0 MW
StateKansas
CountyCloud/Mitchell
Point of interconnectionElm Creek 345kV substation
Requested (queue) date2017-11-17
Proposed in-service date2027-12-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerITCGP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata