ELP Holland Solar (1579)

ELP Holland Solar is a 20.0 MW other interconnection project in Erie, New York with a current status of withdrawn. It is proposed to connect at A new 34.5kV three breaker ring bus switching station, tapped on the NYSEG?s existing 34.5 kV line #520 from NYSEG?s Cobble Hill_34.5 kV to NYSEG?s Stolle Rd_34.5 kV. 10.5 miles from Cobble Hill_34.5 kV, 17 miles to Stolle Rd_34.5 kV..

20.0 MWCapacity
WithdrawnStatus
AMarket
OtherTechnology

Project facts

Canonical nameELP Holland Solar
Queue ID1579
Statuswithdrawn
Source status0
MarketA
TechnologyOther
Capacity20.0 MW
StateNew York
CountyErie
Point of interconnectionA new 34.5kV three breaker ring bus switching station, tapped on the NYSEG?s existing 34.5 kV line #520 from NYSEG?s Cobble Hill_34.5 kV to NYSEG?s Stolle Rd_34.5 kV. 10.5 miles from Cobble Hill_34.5 kV, 17 miles to Stolle Rd_34.5 kV.
Requested (queue) date2023-07-13
Proposed in-service date2023-09-30
Operational date
Withdrawn date
DeveloperELP Holland Solar LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata