ELP Holland Solar (1579)
ELP Holland Solar is a 20.0 MW other interconnection project in Erie, New York with a current status of withdrawn. It is proposed to connect at A new 34.5kV three breaker ring bus switching station, tapped on the NYSEG?s existing 34.5 kV line #520 from NYSEG?s Cobble Hill_34.5 kV to NYSEG?s Stolle Rd_34.5 kV. 10.5 miles from Cobble Hill_34.5 kV, 17 miles to Stolle Rd_34.5 kV..
Project facts
| Canonical name | ELP Holland Solar |
|---|---|
| Queue ID | 1579 |
| Status | withdrawn |
| Source status | 0 |
| Market | A |
| Technology | Other |
| Capacity | 20.0 MW |
| State | New York |
| County | Erie |
| Point of interconnection | A new 34.5kV three breaker ring bus switching station, tapped on the NYSEG?s existing 34.5 kV line #520 from NYSEG?s Cobble Hill_34.5 kV to NYSEG?s Stolle Rd_34.5 kV. 10.5 miles from Cobble Hill_34.5 kV, 17 miles to Stolle Rd_34.5 kV. |
| Requested (queue) date | 2023-07-13 |
| Proposed in-service date | 2023-09-30 |
| Operational date | — |
| Withdrawn date | — |
| Developer | ELP Holland Solar LLC |
| Utility / transmission owner | NYSEG |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.