Elsie Tap 115 kV (GEN-2022-057)

Elsie Tap 115 kV is a 87.0 MW solar interconnection project with a current status of withdrawn. It is proposed to connect at Elsie Tap 115 kV.

87.0 MWCapacity
WithdrawnStatus
NEMarket
SolarTechnology

Project facts

Canonical nameElsie Tap 115 kV
Queue IDGEN-2022-057
Statuswithdrawn
Source statusWITHDRAWN
MarketNE
TechnologySolar
Capacity87.0 MW
StateNebraska
County—
Point of interconnectionElsie Tap 115 kV
Requested (queue) date2022-06-23
Proposed in-service date2025-12-31
Operational date—
Withdrawn date2023-11-06
Developer—
Utility / transmission ownerTri-State Generation and Transmission Association

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata