Elysium Energy Center BESS (29INR0145)

Elysium Energy Center BESS is a 100.0 MW other interconnection project in Fort Bend, Texas with a current status of operational. It is proposed to connect at 44030 Arcola 138 kV.

100.0 MWCapacity
OperationalStatus
Fort BendMarket
OtherTechnology

Project facts

Canonical nameElysium Energy Center BESS
Queue ID29INR0145
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketFort Bend
TechnologyOther
Capacity100.0 MW
StateTexas
CountyFort Bend
Point of interconnection44030 Arcola 138 kV
Requested (queue) date2025-04-21
Proposed in-service date
Operational date2030-01-17
Withdrawn date
DeveloperAdapture Solar Development
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-28

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata