EMPower Odessa (TEF - Due Diligence) (27INR0272)

EMPower Odessa (TEF - Due Diligence) is a 122.8 MW gas interconnection project in Ector, Texas with a current status of withdrawn.

122.8 MWCapacity
WithdrawnStatus
EctorMarket
GasTechnology

Project facts

Canonical nameEMPower Odessa (TEF - Due Diligence)
Queue ID27INR0272
Statuswithdrawn
Source status—
MarketEctor
TechnologyGas
Capacity122.8 MW
StateTexas
CountyEctor
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2026-09-03
Developer—
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-30developerEMPOWER USA, LLC—low
2026-10-30poi_nameTap 138 kV 1110 EDWARDS TAP - 1102 JUDKINS—low
2026-10-30phaseSS Completed, FIS Started, IA—low
2026-10-30ia_signed_date2026-03-13—medium
2026-10-30operational_date2028-03-09—medium
2026-10-30withdrawn_date—2026-09-03high
2026-10-30statusoperationalwithdrawnhigh
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata