EMPower Odessa (TEF - Due Diligence) (27INR0272)
EMPower Odessa (TEF - Due Diligence) is a 122.8 MW gas interconnection project in Ector, Texas with a current status of withdrawn.
122.8 MWCapacity
WithdrawnStatus
EctorMarket
GasTechnology
Project facts
| Canonical name | EMPower Odessa (TEF - Due Diligence) |
|---|---|
| Queue ID | 27INR0272 |
| Status | withdrawn |
| Source status | — |
| Market | Ector |
| Technology | Gas |
| Capacity | 122.8 MW |
| State | Texas |
| County | Ector |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2026-09-03 |
| Developer | — |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | developer | EMPOWER USA, LLC | — | low |
| 2026-10-30 | poi_name | Tap 138 kV 1110 EDWARDS TAP - 1102 JUDKINS | — | low |
| 2026-10-30 | phase | SS Completed, FIS Started, IA | — | low |
| 2026-10-30 | ia_signed_date | 2026-03-13 | — | medium |
| 2026-10-30 | operational_date | 2028-03-09 | — | medium |
| 2026-10-30 | withdrawn_date | — | 2026-09-03 | high |
| 2026-10-30 | status | operational | withdrawn | high |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata