EMPower Odessa (TEF - Due Diligence) (27INR0272)

EMPower Odessa (TEF - Due Diligence) is a 122.8 MW gas interconnection project in Ector, Texas with a current status of operational. It is proposed to connect at Tap 138 kV 1110 EDWARDS TAP - 1102 JUDKINS.

122.8 MWCapacity
OperationalStatus
EctorMarket
GasTechnology

Project facts

Canonical nameEMPower Odessa (TEF - Due Diligence)
Queue ID27INR0272
Statusoperational
Source statusSS Completed, FIS Started, IA
MarketEctor
TechnologyGas
Capacity122.8 MW
StateTexas
CountyEctor
Point of interconnectionTap 138 kV 1110 EDWARDS TAP - 1102 JUDKINS
Requested (queue) date2024-07-22
Proposed in-service date
Operational date2028-03-09
Withdrawn date
DeveloperEmPower CES, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata