Enable 1200 MW injection at Mystic (1332)

Enable 1200 MW injection at Mystic is a 1,200.0 MW generation interconnection project with a current status of withdrawn.

1,200.0 MWCapacity
WithdrawnStatus
BOSTMarket
GenerationTechnology

Project facts

Canonical nameEnable 1200 MW injection at Mystic
Queue ID1332
Statuswithdrawn
Source statusW
MarketBOST
TechnologyGeneration
Capacity1,200.0 MW
StateMassachusetts
County
Point of interconnection
Requested (queue) date2022-11-08
Proposed in-service date2029-12-30
Operational date
Withdrawn date2023-11-22
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata