Endless Mountain Wind (0218)

Endless Mountain Wind is a 150.0 MW wind interconnection project in Tioga - Bradford, Pennsylvania with a current status of withdrawn. It is proposed to connect at Homer City-Watercure 345kV.

150.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameEndless Mountain Wind
Queue ID0218
Statuswithdrawn
Source status0
Market
TechnologyWind
Capacity150.0 MW
StatePennsylvania
CountyTioga - Bradford
Point of interconnectionHomer City-Watercure 345kV
Requested (queue) date2006-07-03
Proposed in-service date2006-07-27
Operational date
Withdrawn date
DeveloperGamesa Energy USA
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.