Energy City BESS (26INR0231)

Energy City BESS is a 204.9 MW other interconnection project in Midland, Texas with a current status of operational. It is proposed to connect at Tap 138kV 1179 Texaco Mabee Tap - 1200 Mariensfield.

204.9 MWCapacity
OperationalStatus
MidlandMarket
OtherTechnology

Project facts

Canonical nameEnergy City BESS
Queue ID26INR0231
Statusoperational
Source statusSS Completed, FIS Completed, No IA
MarketMidland
TechnologyOther
Capacity204.9 MW
StateTexas
CountyMidland
Point of interconnectionTap 138kV 1179 Texaco Mabee Tap - 1200 Mariensfield
Requested (queue) date2023-10-04
Proposed in-service date
Operational date2027-06-30
Withdrawn date
DeveloperEnergy Efficiency Solar, Inc. dba ACRO Energy Inc.
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata