Energy Storage (689)

Energy Storage is a 100.0 MW battery interconnection project in Middlesex, Massachusetts with a current status of withdrawn. It is proposed to connect at Wakefield 115 kV Substation Bus (Bus #114433).

100.0 MWCapacity
WithdrawnStatus
BOSTMarket
BatteryTechnology

Project facts

Canonical nameEnergy Storage
Queue ID689
Statuswithdrawn
Source statusW
MarketBOST
TechnologyBattery
Capacity100.0 MW
StateMassachusetts
CountyMiddlesex
Point of interconnectionWakefield 115 kV Substation Bus (Bus #114433)
Requested (queue) date2017-11-21
Proposed in-service date2023-05-31
Operational date
Withdrawn date2020-02-14
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata