Enfinity Post Oak Solar SLF (29INR0291)

Enfinity Post Oak Solar SLF is a 500.0 MW solar interconnection project in Borden, Texas with a current status of operational. It is proposed to connect at 345kV Muleshoe (59922).

500.0 MWCapacity
OperationalStatus
BordenMarket
SolarTechnology

Project facts

Canonical nameEnfinity Post Oak Solar SLF
Queue ID29INR0291
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketBorden
TechnologySolar
Capacity500.0 MW
StateTexas
CountyBorden
Point of interconnection345kV Muleshoe (59922)
Requested (queue) date2026-03-30
Proposed in-service date
Operational date2029-12-18
Withdrawn date
DeveloperEG White Oak LLC
Utility / transmission ownerERCOT

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata