Enfinity Post Oak Solar SLF (29INR0291)
Enfinity Post Oak Solar SLF is a 500.0 MW solar interconnection project in Borden, Texas with a current status of operational. It is proposed to connect at 345kV Muleshoe (59922).
500.0 MWCapacity
OperationalStatus
BordenMarket
SolarTechnology
Project facts
| Canonical name | Enfinity Post Oak Solar SLF |
|---|---|
| Queue ID | 29INR0291 |
| Status | operational |
| Source status | SS Completed, FIS Started, No IA |
| Market | Borden |
| Technology | Solar |
| Capacity | 500.0 MW |
| State | Texas |
| County | Borden |
| Point of interconnection | 345kV Muleshoe (59922) |
| Requested (queue) date | 2026-03-30 |
| Proposed in-service date | — |
| Operational date | 2029-12-18 |
| Withdrawn date | — |
| Developer | EG White Oak LLC |
| Utility / transmission owner | ERCOT |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.