Engle 69kV (W2-062)

Engle 69kV is a 12.1 MW other interconnection project in Perry, Kentucky with a current status of withdrawn.

12.1 MWCapacity
WithdrawnStatus
Market
OtherTechnology

Project facts

Canonical nameEngle 69kV
Queue IDW2-062
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyOther
Capacity12.1 MW
StateKentucky
CountyPerry
Point of interconnection
Requested (queue) date2010-07-29
Proposed in-service date2012-12-31
Operational date
Withdrawn date2010-08-30
Developer
Utility / transmission ownerAEP

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata