Englehardt BESS (28INR0436)

Englehardt BESS is a 200.5 MW other interconnection project in Comal, Texas with a current status of operational. It is proposed to connect at River Oaks (7173).

200.5 MWCapacity
OperationalStatus
ComalMarket
OtherTechnology

Project facts

Canonical nameEnglehardt BESS
Queue ID28INR0436
Statusoperational
Source statusSS Completed, FIS Started, No IA
MarketComal
TechnologyOther
Capacity200.5 MW
StateTexas
CountyComal
Point of interconnectionRiver Oaks (7173)
Requested (queue) date2025-09-22
Proposed in-service date
Operational date2027-09-01
Withdrawn date
DeveloperComal BESS LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectoperationalhigh

Explore related data

Source last checked2026-08-01
Data last materially changed2026-08-01
Page data generated2026-08-27

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata