Enon 138 kV (H14_W67)

Enon 138 kV is a 500.0 MW gas interconnection project in Unknown, Pennsylvania with a current status of withdrawn.

500.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameEnon 138 kV
Queue IDH14_W67
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyGas
Capacity500.0 MW
StatePennsylvania
CountyUnknown
Point of interconnection
Requested (queue) date2001-12-10
Proposed in-service date2007-01-01
Operational date
Withdrawn date2002-07-08
Developer
Utility / transmission ownerAPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.