Entergy Freeport 230 kV Substation (J1813)

Entergy Freeport 230 kV Substation is a 920.0 MW gas interconnection project in DeSoto, Mississippi with a current status of operational. It is proposed to connect at Entergy Freeport 230 kV Substation.

920.0 MWCapacity
OperationalStatus
Market
GasTechnology

Project facts

Canonical nameEntergy Freeport 230 kV Substation
Queue IDJ1813
Statusoperational
Source statusDone
Market
TechnologyGas
Capacity920.0 MW
StateMississippi
CountyDeSoto
Point of interconnectionEntergy Freeport 230 kV Substation
Requested (queue) date2022-07-07
Proposed in-service date2020-03-20
Operational date2020-03-20
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata