The interXdata warehouse tracks 25 interconnection projects in DeSoto, Mississippi, representing 7,165 MW of requested capacity.
25Total projects
3Active
15Operational
7Withdrawn
7,165 MWRequested capacity
Technology mix
| Technology | Projects | Requested capacity |
|---|---|---|
| Gas | 10 | 3,006 MW |
| Other | 6 | 2,545 MW |
| Solar | 6 | 864 MW |
| Battery | 3 | 750 MW |
Projects
| Project | Queue ID | Technology | Capacity | Status | Location |
|---|---|---|---|---|---|
| Entergy Freeport 230 kV Substation | J1813 | Gas | 920.0 MW | operational | DeSoto, Mississippi |
| Southeast Queue Project 44 — Other in Desoto, Mississippi | 44 | Other | 900.0 MW | operational | Desoto, Mississippi |
| Southeast Queue Project 102 — Other in Desoto, Mississippi | 102 | Other | 640.0 MW | withdrawn | Desoto, Mississippi |
| Southeast Queue Project 396 — Gas in Desoto, Mississippi | 396 | Gas | 593.0 MW | withdrawn | Desoto, Mississippi |
| Southeast Queue Project 186 — Other in Desoto, Mississippi | 186 | Other | 500.0 MW | withdrawn | Desoto, Mississippi |
| Southeast Queue Project 107 — Other in Desoto, Mississippi | 107 | Other | 500.0 MW | withdrawn | Desoto, Mississippi |
| Southeast Queue Project 397 — Gas in Desoto, Mississippi | 397 | Gas | 474.0 MW | withdrawn | Desoto, Mississippi |
| Southeast Queue Project 608 — Battery in Desoto, Mississippi | 608 | Battery | 400.0 MW | withdrawn | Desoto, Mississippi |
| Twinkletown 230 kV | J2602 | Solar | 250.0 MW | operational | DeSoto, Mississippi |
| TWINKLETOWN 230 KV | J2091 | Battery | 250.0 MW | operational | DeSoto, Mississippi |
| Robinsonville 230 kV | J2047 | Solar | 199.0 MW | operational | DeSoto, Mississippi |
| Penton Solar Plant | 68029_PSP | Solar | 190.0 MW | active | DeSoto, Mississippi |
| TVA Southaven Combined Cycle | 55269_CTG1 | Gas | 179.3 MW | operational | Desoto, Mississippi |
| TVA Southaven Combined Cycle | 55269_CTG2 | Gas | 179.3 MW | operational | Desoto, Mississippi |
| TVA Southaven Combined Cycle | 55269_CTG3 | Gas | 179.3 MW | operational | Desoto, Mississippi |
| TVA Southaven Combined Cycle | 55269_STG1 | Gas | 122.0 MW | operational | Desoto, Mississippi |
| TVA Southaven Combined Cycle | 55269_STG3 | Gas | 122.0 MW | operational | Desoto, Mississippi |
| TVA Southaven Combined Cycle | 55269_STG2 | Gas | 122.0 MW | operational | Desoto, Mississippi |
| Southeast Queue Project 317 — Gas in Desoto, Mississippi | 317 | Gas | 115.0 MW | operational | Desoto, Mississippi |
| TWINKLETOWN | S1134 | Battery | 100.0 MW | operational | DeSoto, Mississippi |
| Wildflower Solar, LLC (MS) | 66369_WDFL | Solar | 100.0 MW | operational | DeSoto, Mississippi |
| Twinkletown 230 kV | J1748 | Solar | 100.0 MW | operational | DeSoto, Mississippi |
| MISO Queue Project J381 — Solar in Desoto, Mississippi | J381 | Solar | 25.0 MW | withdrawn | Desoto, Mississippi |
| Arkabutla Lake Hydroelectric Project | 62402_NA1 | Other | 2.5 MW | active | DeSoto, Mississippi |
| Arkabutla Lake Hydroelectric Project | 62402_NA2 | Other | 2.5 MW | active | DeSoto, Mississippi |
Top developers
Developer attribution is not yet resolved for this set.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Get an alert when a new project is proposed in DeSoto County.
Start tracking with interXdata