DeSoto County, Mississippi — Interconnection Projects

The interXdata warehouse tracks 25 interconnection projects in DeSoto, Mississippi, representing 7,165 MW of requested capacity.

25Total projects
3Active
15Operational
7Withdrawn
7,165 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Gas103,006 MW
Other62,545 MW
Solar6864 MW
Battery3750 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Entergy Freeport 230 kV SubstationJ1813Gas920.0 MWoperationalDeSoto, Mississippi
Southeast Queue Project 44 — Other in Desoto, Mississippi44Other900.0 MWoperationalDesoto, Mississippi
Southeast Queue Project 102 — Other in Desoto, Mississippi102Other640.0 MWwithdrawnDesoto, Mississippi
Southeast Queue Project 396 — Gas in Desoto, Mississippi396Gas593.0 MWwithdrawnDesoto, Mississippi
Southeast Queue Project 186 — Other in Desoto, Mississippi186Other500.0 MWwithdrawnDesoto, Mississippi
Southeast Queue Project 107 — Other in Desoto, Mississippi107Other500.0 MWwithdrawnDesoto, Mississippi
Southeast Queue Project 397 — Gas in Desoto, Mississippi397Gas474.0 MWwithdrawnDesoto, Mississippi
Southeast Queue Project 608 — Battery in Desoto, Mississippi608Battery400.0 MWwithdrawnDesoto, Mississippi
Twinkletown 230 kVJ2602Solar250.0 MWoperationalDeSoto, Mississippi
TWINKLETOWN 230 KVJ2091Battery250.0 MWoperationalDeSoto, Mississippi
Robinsonville 230 kVJ2047Solar199.0 MWoperationalDeSoto, Mississippi
Penton Solar Plant68029_PSPSolar190.0 MWactiveDeSoto, Mississippi
TVA Southaven Combined Cycle55269_CTG1Gas179.3 MWoperationalDesoto, Mississippi
TVA Southaven Combined Cycle55269_CTG2Gas179.3 MWoperationalDesoto, Mississippi
TVA Southaven Combined Cycle55269_CTG3Gas179.3 MWoperationalDesoto, Mississippi
TVA Southaven Combined Cycle55269_STG1Gas122.0 MWoperationalDesoto, Mississippi
TVA Southaven Combined Cycle55269_STG3Gas122.0 MWoperationalDesoto, Mississippi
TVA Southaven Combined Cycle55269_STG2Gas122.0 MWoperationalDesoto, Mississippi
Southeast Queue Project 317 — Gas in Desoto, Mississippi317Gas115.0 MWoperationalDesoto, Mississippi
TWINKLETOWNS1134Battery100.0 MWoperationalDeSoto, Mississippi
Wildflower Solar, LLC (MS)66369_WDFLSolar100.0 MWoperationalDeSoto, Mississippi
Twinkletown 230 kVJ1748Solar100.0 MWoperationalDeSoto, Mississippi
MISO Queue Project J381 — Solar in Desoto, MississippiJ381Solar25.0 MWwithdrawnDesoto, Mississippi
Arkabutla Lake Hydroelectric Project62402_NA1Other2.5 MWactiveDeSoto, Mississippi
Arkabutla Lake Hydroelectric Project62402_NA2Other2.5 MWactiveDeSoto, Mississippi

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned); Lawrence Berkeley National Laboratory — Queued Up interconnection dataset; MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in DeSoto County.