Equipment Addition (281)

Equipment Addition is a 45.0 MW gas interconnection project in Windham, Connecticut with a current status of operational. It is proposed to connect at CL&P 345 kV Lake Road substation.

45.0 MWCapacity
OperationalStatus
RIMarket
GasTechnology

Project facts

Canonical nameEquipment Addition
Queue ID281
Statusoperational
Source statusC
MarketRI
TechnologyGas
Capacity45.0 MW
StateConnecticut
CountyWindham
Point of interconnectionCL&P 345 kV Lake Road substation
Requested (queue) date2008-10-07
Proposed in-service date
Operational date2009-01-30
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata