Erick 138kV Substation (GEN-2020-SR1)
Erick 138kV Substation is a 40.0 MW battery interconnection project in Beckham, Oklahoma with a current status of withdrawn. It is proposed to connect at Erick 138kV Substation.
40.0 MWCapacity
WithdrawnStatus
OKMarket
BatteryTechnology
Project facts
| Canonical name | Erick 138kV Substation |
|---|---|
| Queue ID | GEN-2020-SR1 |
| Status | withdrawn |
| Source status | TERMINATED |
| Market | OK |
| Technology | Battery |
| Capacity | 40.0 MW |
| State | Oklahoma |
| County | Beckham |
| Point of interconnection | Erick 138kV Substation |
| Requested (queue) date | 2020-08-04 |
| Proposed in-service date | 2024-06-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | WFEC |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata