Erie East 230 kV (AE2-299)

Erie East 230 kV is a 160.0 MW battery interconnection project in Erie, Pennsylvania with a current status of suspended.

160.0 MWCapacity
SuspendedStatus
—Market
BatteryTechnology

Project facts

Canonical nameErie East 230 kV
Queue IDAE2-299
Statussuspended
Source statusSuspended
Market—
TechnologyBattery
Capacity160.0 MW
StatePennsylvania
CountyErie
Point of interconnection—
Requested (queue) date2019-03-22
Proposed in-service date2026-06-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPENELEC

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—suspendedhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata