Erie East 230 kV (AE2-299)
Erie East 230 kV is a 160.0 MW battery interconnection project in Erie, Pennsylvania with a current status of withdrawn.
160.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology
Project facts
| Canonical name | Erie East 230 kV |
|---|---|
| Queue ID | AE2-299 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | — |
| Technology | Battery |
| Capacity | 160.0 MW |
| State | Pennsylvania |
| County | Erie |
| Point of interconnection | — |
| Requested (queue) date | 2019-03-22 |
| Proposed in-service date | 2026-06-01 |
| Operational date | — |
| Withdrawn date | 2026-11-19 |
| Developer | — |
| Utility / transmission owner | PENELEC |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-11-20 | withdrawn_date | — | 2026-11-19 | high |
| 2026-10-23 | status | suspended | withdrawn | high |
| 2026-07-29 | new_project | — | suspended | high |
Explore related data
Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26
Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.