Erie-Wyoming County Solar (0785)
Erie-Wyoming County Solar is a 175.0 MW other interconnection project in Wyoming, New York with a current status of withdrawn. It is proposed to connect at Stolle Road - High Sheldon 230kV.
175.0 MWCapacity
WithdrawnStatus
CMarket
OtherTechnology
Project facts
| Canonical name | Erie-Wyoming County Solar |
|---|---|
| Queue ID | 0785 |
| Status | withdrawn |
| Source status | 0 |
| Market | C |
| Technology | Other |
| Capacity | 175.0 MW |
| State | New York |
| County | Wyoming |
| Point of interconnection | Stolle Road - High Sheldon 230kV |
| Requested (queue) date | 2018-12-12 |
| Proposed in-service date | 2024-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | ConnectGen Erie-Wyoming LLC |
| Utility / transmission owner | NYSEG |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-31 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27
Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.