Erie-Wyoming County Solar is a 175.0 MW other interconnection project in Wyoming, New York with a current status of withdrawn. It is proposed to connect at Stolle Road - High Sheldon 230kV.

175.0 MWCapacity
WithdrawnStatus
CMarket
OtherTechnology

Project facts

Canonical nameErie-Wyoming County Solar
Queue ID0785
Statuswithdrawn
Source status0
MarketC
TechnologyOther
Capacity175.0 MW
StateNew York
CountyWyoming
Point of interconnectionStolle Road - High Sheldon 230kV
Requested (queue) date2018-12-12
Proposed in-service date2024-12-31
Operational date
Withdrawn date
DeveloperConnectGen Erie-Wyoming LLC
Utility / transmission ownerNYSEG

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.