Erika Solar (24INR0303)

Erika Solar is a 200.5 MW solar interconnection project in Kaufman, Texas with a current status of operational. It is proposed to connect at Tap 345kV ELKTON 5 (#3105 ) to Tricrn1 5 (#2432).

200.5 MWCapacity
OperationalStatus
KaufmanMarket
SolarTechnology

Project facts

Canonical nameErika Solar
Queue ID24INR0303
Statusoperational
Source statusSS Completed, FIS Completed, IA
MarketKaufman
TechnologySolar
Capacity200.5 MW
StateTexas
CountyKaufman
Point of interconnectionTap 345kV ELKTON 5 (#3105 ) to Tricrn1 5 (#2432)
Requested (queue) date2022-07-25
Proposed in-service date—
Operational date2026-11-25
Withdrawn date—
DeveloperErika Solar, LLC
Utility / transmission ownerERCOT

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-31operational_date2027-06-302026-11-25medium
2026-07-31new_project—operationalhigh

Explore related data

Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26

Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata