Erving Paper Mills (54228_3)

Erving Paper Mills is a 5.6 MW gas interconnection project in Franklin, Massachusetts with a current status of operational.

5.6 MWCapacity
OperationalStatus
ISNEMarket
GasTechnology

Project facts

Canonical nameErving Paper Mills
Queue ID54228_3
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyGas
Capacity5.6 MW
StateMassachusetts
CountyFranklin
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2015-11-01
Withdrawn date
Developer
Utility / transmission ownerErving Paper Mills Inc

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.