ESCONDIDO ENERGY CENTER 2 (1048)

ESCONDIDO ENERGY CENTER 2 is a 33.0 MW battery interconnection project in San Diego, California with a current status of active. It is proposed to connect at Escondido Substation 69 kV.

33.0 MWCapacity
ActiveStatus
SDGEMarket
BatteryTechnology

Project facts

Canonical nameESCONDIDO ENERGY CENTER 2
Queue ID1048
Statusactive
Source statusACTIVE
MarketSDGE
TechnologyBattery
Capacity33.0 MW
StateCalifornia
CountySan Diego
Point of interconnectionEscondido Substation 69 kV
Requested (queue) date2014-04-30
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerSDGE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectactivehigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata