ESPRESSO (1912)

ESPRESSO is a 300.0 MW battery interconnection project in Alameda, California with a current status of active. It is proposed to connect at Tesla 230 kV.

300.0 MWCapacity
ActiveStatus
—Market
BatteryTechnology

Project facts

Canonical nameESPRESSO
Queue ID1912
Statusactive
Source statusACTIVE
Market—
TechnologyBattery
Capacity300.0 MW
StateCalifornia
CountyAlameda
Point of interconnectionTesla 230 kV
Requested (queue) date2021-04-15
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—activehigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata