ESS-H445 3B 138kv (AH1-341 - moved to TC2)

ESS-H445 3B 138kv is a 150.0 MW solar interconnection project in Ogle, Illinois with a current status of withdrawn.

150.0 MWCapacity
WithdrawnStatus
—Market
SolarTechnology

Project facts

Canonical nameESS-H445 3B 138kv
Queue IDAH1-341 - moved to TC2
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologySolar
Capacity150.0 MW
StateIllinois
CountyOgle
Point of interconnection—
Requested (queue) date2021-09-10
Proposed in-service date2029-04-20
Operational date—
Withdrawn date2026-09-30
Developer—
Utility / transmission ownerComEd

What changed

ObservedFieldOld valueNew valueMateriality
2026-10-01proposed_online_date—2029-04-20medium
2026-10-01withdrawn_date2026-01-132026-09-30high
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata