EUDORA - CHICKASAW (LAGEN) 115.0kV (J2644)

EUDORA - CHICKASAW (LAGEN) 115.0kV is a 90.0 MW solar interconnection project in Chicot, Arkansas with a current status of withdrawn. It is proposed to connect at EUDORA - CHICKASAW (LAGEN) 115.0kV.

90.0 MWCapacity
WithdrawnStatus
Market
SolarTechnology

Project facts

Canonical nameEUDORA - CHICKASAW (LAGEN) 115.0kV
Queue IDJ2644
Statuswithdrawn
Source statusWithdrawn
Market
TechnologySolar
Capacity90.0 MW
StateArkansas
CountyChicot
Point of interconnectionEUDORA - CHICKASAW (LAGEN) 115.0kV
Requested (queue) date2022-09-10
Proposed in-service date2025-06-01
Operational date2025-06-01
Withdrawn date2025-07-30
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata