Evergreen 138kV (AB1-015)

Evergreen 138kV is a 16.5 MW gas interconnection project in Trumbull, Ohio with a current status of withdrawn.

16.5 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameEvergreen 138kV
Queue IDAB1-015
Statuswithdrawn
Source statusDeactivated
Market
TechnologyGas
Capacity16.5 MW
StateOhio
CountyTrumbull
Point of interconnection
Requested (queue) date2015-06-16
Proposed in-service date2017-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.