Eversource Group @ Falmouth 993 (998)

Eversource Group @ Falmouth 993 is a 8.0 MW solar+battery interconnection project in Barnstable, Massachusetts with a current status of withdrawn. It is proposed to connect at Eversource Falmouth 933.

8.0 MWCapacity
WithdrawnStatus
SEMAMarket
Solar+BatteryTechnology

Project facts

Canonical nameEversource Group @ Falmouth 993
Queue ID998
Statuswithdrawn
Source statusW
MarketSEMA
TechnologySolar+Battery
Capacity8.0 MW
StateMassachusetts
CountyBarnstable
Point of interconnectionEversource Falmouth 933
Requested (queue) date2020-04-09
Proposed in-service date2023-11-30
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.