Exie Solar (AG1-354)

Exie Solar is a 150.0 MW solar interconnection project in Green, Kentucky with a current status of active. It is proposed to connect at Summershade-Green County 161 kV.

150.0 MWCapacity
ActiveStatus
PJMMarket
SolarTechnology

Project facts

Canonical nameExie Solar
Queue IDAG1-354
Statusactive
Source statusactive
MarketPJM
TechnologySolar
Capacity150.0 MW
StateKentucky
CountyGreen
Point of interconnectionSummershade-Green County 161 kV
Requested (queue) date2020-09-30
Proposed in-service date2028-10-30
Operational date
Withdrawn date
DeveloperExie Solar, LLC
Utility / transmission ownerEKPC

What changed

No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27

Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata