Exodus BESS (24INR0459)
Exodus BESS is a 201.4 MW battery interconnection project in Caldwell, Texas with a current status of withdrawn.
201.4 MWCapacity
WithdrawnStatus
CaldwellMarket
BatteryTechnology
Project facts
| Canonical name | Exodus BESS |
|---|---|
| Queue ID | 24INR0459 |
| Status | withdrawn |
| Source status | — |
| Market | Caldwell |
| Technology | Battery |
| Capacity | 201.4 MW |
| State | Texas |
| County | Caldwell |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2026-09-01 |
| Developer | — |
| Utility / transmission owner | ERCOT |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-10-30 | developer | Exodus Solar LLC | — | low |
| 2026-10-30 | poi_name | Tap 345kV 7040 Austrop – 7042 Zorn | — | low |
| 2026-10-30 | phase | SS Completed, FIS Started, No IA | — | low |
| 2026-10-30 | operational_date | 2027-12-01 | — | medium |
| 2026-10-30 | withdrawn_date | — | 2026-09-01 | high |
| 2026-10-30 | status | operational | withdrawn | high |
| 2026-07-31 | new_project | — | operational | high |
Explore related data
Source last checked2026-10-30
Data last materially changed2026-10-30
Page data generated2026-11-26
Provenance: ERCOT — Generation Interconnection Status (GIS) report. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata