FAIRFIELD ENERGY CENTER - 730 MW (452)
FAIRFIELD ENERGY CENTER - 730 MW is a 730.0 MW gas interconnection project in Solano, California with a current status of withdrawn. It is proposed to connect at Loop Lakesville-Sobrante and Lakesville-Ignacio 230kV Lines.
730.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology
Project facts
| Canonical name | FAIRFIELD ENERGY CENTER - 730 MW |
|---|---|
| Queue ID | 452 |
| Status | withdrawn |
| Source status | WITHDRAWN |
| Market | — |
| Technology | Gas |
| Capacity | 730.0 MW |
| State | California |
| County | Solano |
| Point of interconnection | Loop Lakesville-Sobrante and Lakesville-Ignacio 230kV Lines |
| Requested (queue) date | 2008-06-02 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2008-11-24 |
| Developer | — |
| Utility / transmission owner | PGAE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-07-29 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28
Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata