FAIRFIELD ENERGY CENTER (257)

FAIRFIELD ENERGY CENTER is a 575.0 MW gas interconnection project in Solano, California with a current status of withdrawn. It is proposed to connect at New Fairfield Substation 230kV bus.

575.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameFAIRFIELD ENERGY CENTER
Queue ID257
Statuswithdrawn
Source statusWITHDRAWN
Market
TechnologyGas
Capacity575.0 MW
StateCalifornia
CountySolano
Point of interconnectionNew Fairfield Substation 230kV bus
Requested (queue) date2007-09-10
Proposed in-service date
Operational date
Withdrawn date2011-04-21
Developer
Utility / transmission ownerPGAE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: California ISO — public interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.