Fairview 115kV Substation (GEN-2021-003)

Fairview 115kV Substation is a 75.5 MW solar interconnection project in Richland, Montana with a current status of withdrawn. It is proposed to connect at Fairview 115kV Substation.

75.5 MWCapacity
WithdrawnStatus
MTMarket
SolarTechnology

Project facts

Canonical nameFairview 115kV Substation
Queue IDGEN-2021-003
Statuswithdrawn
Source statusWITHDRAWN
MarketMT
TechnologySolar
Capacity75.5 MW
StateMontana
CountyRichland
Point of interconnectionFairview 115kV Substation
Requested (queue) date2020-12-11
Proposed in-service date2024-12-15
Operational date
Withdrawn date2023-07-14
Developer
Utility / transmission ownerWAPA/BEPC/HCPD Integrated System

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata