Fairview 138 kV Substation (J2408)

Fairview 138 kV Substation is a 100.0 MW battery interconnection project in Switzerland, Indiana with a current status of withdrawn. It is proposed to connect at Fairview 138 kV Substation.

100.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameFairview 138 kV Substation
Queue IDJ2408
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity100.0 MW
StateIndiana
CountySwitzerland
Point of interconnectionFairview 138 kV Substation
Requested (queue) date2022-09-12
Proposed in-service date2026-03-07
Operational date2026-03-07
Withdrawn date2023-03-24
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata