Fall Creek 345 kV (AF2-407 - moved to TC1)

Fall Creek 345 kV is a 300.0 MW battery interconnection project in Madison, Indiana with a current status of withdrawn.

300.0 MWCapacity
WithdrawnStatus
Market
BatteryTechnology

Project facts

Canonical nameFall Creek 345 kV
Queue IDAF2-407 - moved to TC1
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyBattery
Capacity300.0 MW
StateIndiana
CountyMadison
Point of interconnection
Requested (queue) date2020-03-31
Proposed in-service date2022-06-01
Operational date
Withdrawn date2026-01-15
Developer
Utility / transmission ownerAEP

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata