Fall Creek - New Castle 138 kV Line Tap (J1031)

Fall Creek - New Castle 138 kV Line Tap is a 150.0 MW wind interconnection project in Henry County, Indiana with a current status of withdrawn. It is proposed to connect at Fall Creek - New Castle 138 kV Line Tap.

150.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameFall Creek - New Castle 138 kV Line Tap
Queue IDJ1031
Statuswithdrawn
Source statusWithdrawn
Market
TechnologyWind
Capacity150.0 MW
StateIndiana
CountyHenry County
Point of interconnectionFall Creek - New Castle 138 kV Line Tap
Requested (queue) date2018-03-12
Proposed in-service date2020-10-01
Operational date2020-10-01
Withdrawn date2020-01-07
Developer
Utility / transmission ownerDuke Energy Progress

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata