Fall Line Hydro (aka Tallasee Shoals) is a 4.0 MW hydro interconnection project in Clarke-Jackson Co, Georgia with a current status of operational. It is proposed to connect at Tallasee Shoals 46 kV Sub.
4.0 MWCapacity
OperationalStatus
SoutheastMarket
HydroTechnology
Project facts
| Canonical name | Fall Line Hydro (aka Tallasee Shoals) |
|---|---|
| Queue ID | GI-032 |
| Status | operational |
| Source status | operational |
| Market | Southeast |
| Technology | Hydro |
| Capacity | 4.0 MW |
| State | Georgia |
| County | Clarke-Jackson Co |
| Point of interconnection | Tallasee Shoals 46 kV Sub |
| Requested (queue) date | 2023-12-31 |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Transmission |
What changed
No material field-level changes have been recorded for this project since the baseline snapshot. interXdata detects changes as new source snapshots are ingested and diffed against prior state.
Explore related data
Source last checked2026-07-31
Data last materially changed2026-07-31
Page data generated2026-08-27
Provenance: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata