Farmersville (TX) (65812_FRMVL)
Farmersville (TX) is a 9.9 MW battery interconnection project in Collin, Texas with a current status of operational.
9.9 MWCapacity
OperationalStatus
ERCOMarket
BatteryTechnology
Project facts
| Canonical name | Farmersville (TX) |
|---|---|
| Queue ID | 65812_FRMVL |
| Status | operational |
| Source status | (OP) Operating |
| Market | ERCO |
| Technology | Battery |
| Capacity | 9.9 MW |
| State | Texas |
| County | Collin |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 2024-04-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | HEN Infrastructure, L.L.C. |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata